CTR Custom Homes — Published Custom Home Pricing and Timeline
CTR Custom Homes — Published Custom Home Pricing and Timeline
Charlotte Builder Profile
What this firm publishes about custom home pricing and build time, quoted from its own website with the source linked. Checked November 2026.
How CTR Custom Homes describes itself
“Lake Norman - Mooresville based luxury home builders”
Lake Norman and Mooresville based luxury home builder publishing an average end-to-end schedule in its FAQ.
Service area: Lake Norman and Mooresville NC, as stated. Experience: Not published.
What CTR Custom Homes publishes about price
We did not find a price per square foot on the page we read (ctrcustomhomes.com FAQ, November 2026). That is common: many custom builders give a number only after seeing drawings and a lot. Ask the firm directly.
What CTR Custom Homes publishes about build time
Published timeline: 14-16 months.
Initial design to move-in, stated as an average and varying with size, architectural complexity, NC permitting, finish selections and weather.
- On average, the firm states that building a custom home with it takes 14 to 16 months from initial design to move-in, depending on size and style, architectural complexity, permitting in North Carolina, finish selections and weather. Source: ctrcustomhomes.com FAQ
Public reviews
No aggregate public rating found.
No aggregate public rating found when checked in September 2026.
Review counts change often. Read the reviews on the platform itself before relying on a number.
Firm website: ctrcustomhomes.com
How this compares with other Charlotte builders
Published figures only, each in the firm's own scope. “Not published” means the number was not on the page we read.
| Builder | Published price | Published timeline |
|---|---|---|
| Peters Custom Homes | See our pricing page | 14-24 months — Construction, from groundbreaking to move-in. Design, permitting and pre-construction take 4-7 months before that, about 18-31 months in total. |
| Cooper Development Group (CDG Carolinas) | $350-$600 / sq ft | 11-16 months — Contract to certificate of occupancy for most of its Charlotte metro custom builds, as of 2026: plan development and permitting 8-14 weeks, vertical construction 9-12 months for a typical 3,500-5,500 sq ft home. |
| Royal Building Group | $250-$500+ / conditioned sq ft | Not published |
| Simonini Homes | Not published | 12-18+ months — Groundbreaking to completion — so design, selections and permitting sit before this window, not inside it. Depends on homesite ownership and whether plans and selections are final. |
| CTR Custom Homes | Not published | 14-16 months — Initial design to move-in, stated as an average and varying with size, architectural complexity, NC permitting, finish selections and weather. |
| Steve Melton Construction | Not published | 10-18 months — Design approval to move-in, with design and pre-construction published at 2-4 months ahead of that. Notes Mecklenburg County and Union County permit through different departments and move at different speeds. |
| Artistic Contractors | $400-$750+ / heated sq ft | 12-18 months — Approximately, from groundbreaking to completion for most of its custom homes; larger estates and more complex architecture take longer. |
How to read these numbers fairly
Builders do not measure the same thing. One firm quotes heated square feet, another conditioned square feet, and a third counts vertical construction only. Land, site work, design fees, pools and landscape are usually outside the published range, and each firm draws that line in a different place.
Timelines start at different points too: at contract, at design approval or at groundbreaking. A shorter published number does not by itself mean a faster builder. It may only leave out design and permitting.
A published range is a planning figure, not a quote. To compare two builders, ask each one for a written scope covering the same house, the same lot and the same finish level, and ask what the price and the schedule each include.