PETERS CUSTOM HOMES
Cooper Development Group — Published Custom Home Pricing and Timeline
Cooper Development Group — Published Custom Home Pricing and Timeline
Charlotte Builder Profile
What this firm publishes about custom home pricing and build time, quoted from its own website with the source linked. Checked November 2026.
How Cooper Development Group describes itself
“veteran-owned custom home builder & remodeling firm in Lake Wylie, SC”
Custom home builder and remodeling firm based in Lake Wylie, SC, publishing a Charlotte cost breakdown by finish level and location.
Service area: Charlotte metro NC and Lake Wylie SC. Experience: 30+ years of construction experience, as stated.
What Cooper Development Group publishes about price
Published range: $350-$600 / sq ft.
Vertical construction only in 2026, excluding land and site work. Also published: $500-$750 often reached in urban neighborhoods such as Myers Park, about $350-$475 for suburban Ballantyne or Steele Creek builds, and finish levels of $350-$425, $425-$525 and $525-$700-plus.
- A true custom home in Charlotte is stated to run $350 to $600 per square foot for vertical construction alone in 2026, exclusive of land and site work. Source: cdgcarolinas.com cost breakdown
- Urban neighborhoods like Myers Park are stated to often reach $500 to $750 per square foot, while suburban Ballantyne or Steele Creek builds settle near $350 to $475. Source: cdgcarolinas.com cost breakdown
- By finish level, the firm publishes $350 to $425 per square foot for a comfortable-but-not-luxury level, $425 to $525 for a premium level and $525 to $700-plus for a luxury level. Source: cdgcarolinas.com cost breakdown
- Site work is stated to add $25,000 to $60,000 on flat suburban lots and $80,000 to $175,000 on wooded septic lots, and to be able to exceed $250,000 on lakefront parcels. Source: cdgcarolinas.com cost breakdown
- Buildable Mecklenburg County infill lots are stated to run $400,000 to $1.5 million, and suburban lots in Matthews or Mint Hill $150,000 to $500,000. Source: cdgcarolinas.com cost breakdown
What Cooper Development Group publishes about build time
Published timeline: 11-16 months.
Contract to certificate of occupancy for most of its Charlotte metro custom builds, as of 2026: plan development and permitting 8-14 weeks, vertical construction 9-12 months for a typical 3,500-5,500 sq ft home.
- Most of the firm's Charlotte metro custom builds are stated to run 11 to 16 months from contract to certificate of occupancy as of 2026. Source: cdgcarolinas.com cost breakdown
- Plan development and permitting are stated to take 8 to 14 weeks, and vertical construction 9 to 12 months for a typical 3,500 to 5,500 square foot home. Source: cdgcarolinas.com cost breakdown
Public reviews
No aggregate public rating found.
No aggregate public rating found when checked in September 2026.
Review counts change often. Read the reviews on the platform itself before relying on a number.
Firm website: cdgcarolinas.com
How this compares with other Charlotte builders
Published figures only, each in the firm's own scope. “Not published” means the number was not on the page we read.
| Builder | Published price | Published timeline |
|---|---|---|
| Peters Custom Homes | See our pricing page | 14-24 months — Construction, from groundbreaking to move-in. Design, permitting and pre-construction take 4-7 months before that, about 18-31 months in total. |
| Cooper Development Group (CDG Carolinas) | $350-$600 / sq ft | 11-16 months — Contract to certificate of occupancy for most of its Charlotte metro custom builds, as of 2026: plan development and permitting 8-14 weeks, vertical construction 9-12 months for a typical 3,500-5,500 sq ft home. |
| Royal Building Group | $250-$500+ / conditioned sq ft | Not published |
| Simonini Homes | Not published | 12-18+ months — Groundbreaking to completion — so design, selections and permitting sit before this window, not inside it. Depends on homesite ownership and whether plans and selections are final. |
| CTR Custom Homes | Not published | 14-16 months — Initial design to move-in, stated as an average and varying with size, architectural complexity, NC permitting, finish selections and weather. |
| Steve Melton Construction | Not published | 10-18 months — Design approval to move-in, with design and pre-construction published at 2-4 months ahead of that. Notes Mecklenburg County and Union County permit through different departments and move at different speeds. |
| Artistic Contractors | $400-$750+ / heated sq ft | 12-18 months — Approximately, from groundbreaking to completion for most of its custom homes; larger estates and more complex architecture take longer. |
How to read these numbers fairly
Builders do not measure the same thing. One firm quotes heated square feet, another conditioned square feet, and a third counts vertical construction only. Land, site work, design fees, pools and landscape are usually outside the published range, and each firm draws that line in a different place.
Timelines start at different points too: at contract, at design approval or at groundbreaking. A shorter published number does not by itself mean a faster builder. It may only leave out design and permitting.
A published range is a planning figure, not a quote. To compare two builders, ask each one for a written scope covering the same house, the same lot and the same finish level, and ask what the price and the schedule each include.